Our latest Technical Insights

  • Filter by industry

  • Filter by products

Precision-engineered solution for railway, metro, and structural vibration challenges. If your project is near a railway line, tram track, or heavy industrial site,
The NOVODAMP® NOVO-U-GUARD Floating Floor Turn-Key Solution for Superior Vibration and Sound Isolation The NOVO-U-GUARD system is a ready-to-install floating floor solution, designed
GERB NOVODAMP® solution to ensure a quiet atmosphere in Busan library despite heavy traffic in tunnels below The city of Busan has committed
India‘s first world class Railway Station Building, redeveloped under the Public Private Partnership (PPP) model. The redevelopment of former Habibganj railway station started
A vibration-isolated mixed-use complex in the immediate vicinity of Aachen Central Station, Germany. Spread over five buildings and almost 25,000 m², people
Providing elasticity at stiffness transition zones between concrete bridge and approach slab Within a comprehensive infrastructure development program, a railway company expanded their
Protecting teaching experimental equipment from vibration and structure-borne noise The extension of Beijing University was completed at the end of August 2021
  • Filter by industry

  • Filter by products

Precision-engineered solution for railway, metro, and structural vibration challenges. If your project is near a railway line, tram track, or heavy industrial site,
The NOVODAMP® NOVO-U-GUARD Floating Floor Turn-Key Solution for Superior Vibration and Sound Isolation The NOVO-U-GUARD system is a ready-to-install floating floor solution, designed
GERB NOVODAMP® solution to ensure a quiet atmosphere in Busan library despite heavy traffic in tunnels below The city of Busan has committed
India‘s first world class Railway Station Building, redeveloped under the Public Private Partnership (PPP) model. The redevelopment of former Habibganj railway station started
A vibration-isolated mixed-use complex in the immediate vicinity of Aachen Central Station, Germany. Spread over five buildings and almost 25,000 m², people
Providing elasticity at stiffness transition zones between concrete bridge and approach slab Within a comprehensive infrastructure development program, a railway company expanded their
Protecting teaching experimental equipment from vibration and structure-borne noise The extension of Beijing University was completed at the end of August 2021
Scroll to Top
Scroll to Top