Retrofit Building Isolation for London Hotel

GERB‘s innovative acoustic solutions for a new hotel project in a challenging urban environment

The site, located in a densely built-up inner-city area, presented unique challenges due to its proximity to old buildings and a railway station, as well as being situated directly above tunnels. The client, keen on achieving a high-performance solution that matched the exceptional quality of the new hotel, sought GERB‘s expertise.

 

The project was officially launched in March 2013. Installation commenced at the end of April 2013, beginning with initial training for the contractor provided by GERB. The actual installation work took approximately one year, running concurrently with the hotel’s fit-out efforts, ensuring a seamless integration of acoustic solutions into the overall design.

Challenge

Building plot and line of underground tunnels

The objective of this project was to address the specific challenges faced by the client during the redevelopment of a hotel from an existing office building. This transformation required not only a significant enhancement in comfort levels for guests but also careful consideration of the building‘s structural integrity. The extension of the building, which was constructed on a piled foundation right above underground train tunnels, posed additional challenges, as it further increased the levels of vibration transmitted into the building. During the fit-out of the upper floors, it became evident that high levels of structure-borne noise and vibration were still apparent, which necessitated the retro-fit installation of vibration isolation measures.


This project was quite unusual even for a retro-fit, as the installation of the spring elements was carried out well into the construction sequence, contrasting with the typical methodology employed in most projects where such measures are integrated much earlier in the process. Ultimately, the project aimed to create a comfortable and serene environment for hotel guests, despite the inherent challenges posed by the building‘s location and structure.

Solution

Technical Facts:

Structure: steel frame structure, bricked walls, concrete footings
Vibration source: underground train tunnels
Elements: GS- and GP-type elements
Base isolation frequency: 2.5 Hz
Design load: 15,200 kN

GERB provided comprehensive support for the client by coordinating closely with both the acoustic consultant and the structural engineer. This collaboration allowed GERB to develop bespoke solutions tailored to the specific challenges posed by the existing columns. To ensure optimal performance, we delivered prestressable spring elements of type GS and GP, designed to achieve an isolation frequency of 2.5Hz. Additionally, GERB conducted training sessions for the installation staff to ensure they were well-prepared for the task at hand. Throughout the installation process, regular inspections were carried out to monitor the work and ensure everything was executed to the highest standards.

Perimeter column
Internal column
Internal wall
Arrangement on piles
Facade detail

Result

GERB was the ideal partner for this project due to our extensive experience in retrofitting spring elements to buildings. Our long- standing expertise allowed us to effectively address the unique challenges presented by the project. Additionally, GERB offers a wide product range that is suitable for the widely varying loads encountered in such constructions. This versatility ensured that the right solutions were available for every aspect of the project. One of the standout features of GERB‘s service was our ability to deliver the first elements quickly, which helped keep the project on schedule. Furthermore, GERB provided invaluable support during both the design phase and on-site implementation, ensuring that everything ran smoothly.

As a result of this collaboration, the finished hotel has consistently received extremely high ratings in customer satisfaction, highlighting the success of the project and the effectiveness of GERB‘s contributions.

Share this post

Further Resources

You need further information on this topic?
Please do not hesitate to contact us with your individual question.
One of our project engineers will get back to you shortly.


    Retrofit Building Isolation of London Hotel

    GERB‘s innovative acoustic solutions for a new hotel project in a challenging urban environment

    The site, located in a densely built-up inner-city area, presented unique challenges due to its proximity to old buildings and a railway station, as well as being situated directly above tunnels. The client, keen on achieving a high-performance solution that matched the exceptional quality of the new hotel, sought GERB‘s expertise.

     

    The project was officially launched in March 2013. Installation commenced at the end of April 2013, beginning with initial training for the contractor provided by GERB. The actual installation work took approximately one year, running concurrently with the hotel’s fit-out efforts, ensuring a seamless integration of acoustic solutions into the overall design.

    Retrofit building isolation of London Hotel

    GERB‘s innovative acoustic solutions for a new hotel project in a challenging urban environment

    The site, located in a densely built-up inner-city area, presented unique challenges due to its proximity to old buildings and a railway station, as well as being situated directly above tunnels. The client, keen on achieving a high-performance solution that matched the exceptional quality of the new hotel, sought GERB‘s expertise.

    The project was officially launched in March 2013. Installation commenced at the end of April 2013, beginning with initial training for the contractor provided by GERB. The actual installation work took approximately one year, running concurrently with the hotel’s fit-out efforts, ensuring a seamless integration of acoustic solutions into the overall design.

    Challenge

    The objective of this project was to address the specific challenges faced by the client during the redevelopment of a hotel from an existing office building. This transformation required not only a significant enhancement in comfort levels for guests but also careful consideration of the building‘s structural integrity. The extension of the building, which was constructed on a piled foundation right above underground train tunnels, posed additional challenges, as it further increased the levels of vibration transmitted into the building. During the fit-out of the upper floors, it became evident that high levels of structure-borne noise and vibration were still apparent, which necessitated the retro-fit installation of vibration isolation measures.


    This project was quite unusual even for a retro-fit, as the installation of the spring elements was carried out well into the construction sequence, contrasting with the typical methodology employed in most projects where such measures are integrated much earlier in the process. Ultimately, the project aimed to create a comfortable and serene environment for hotel guests, despite the inherent challenges posed by the building‘s location and structure.

    Building plot and line of underground tunnels

    Challenge

    The objective of this project was to address the specific challenges faced by the client during the redevelopment of a hotel from an existing office building. This transformation required not only a significant enhancement in comfort levels for guests but also careful consideration of the building‘s structural integrity. The extension of the building, which was constructed on a piled foundation right above underground train tunnels, posed additional challenges, as it further increased the levels of vibration transmitted into the building. During the fit-out of the upper floors, it became evident that high levels of structure-borne noise and vibration were still apparent, which necessitated the retro-fit installation of vibration isolation measures.
    This project was quite unusual even for a retro-fit, as the installation of the spring elements was carried out well into the construction sequence, contrasting with the typical methodology employed in most projects where such measures are integrated much earlier in the process. Ultimately, the project aimed to create a comfortable and serene environment for hotel guests, despite the inherent challenges posed by the building‘s location and structure.

    Building plot and line of underground tunnels

    Solution

    Technical Facts:

    Structure: steel frame structure, bricked walls, concrete footings
    Vibration source: underground train tunnels

    Elements: GS- and GP-type elements
    Base isolation frequency: 2.5 Hz
    Design load: 15,200 kN

    In this recent project, GERB provided comprehensive support for the client by coordinating closely with both the acoustic consultant and the structural engineer. This collaboration allowed GERB to develop bespoke solutions tailored to the specific challenges posed by the existing columns. To ensure optimal performance, we delivered prestressable spring elements of type GS and GP, designed to achieve an isolation frequency of 2.5Hz. Additionally, GERB conducted training sessions for the installation staff to ensure they were well-prepared for the task at hand. Throughout the installation process, regular inspections were carried out to monitor the work and ensure everything was executed to the highest standards.

    Perimeter column
    Internal column
    Internal wall
    Arrangement on piles
    Facade detail

    Result

    GERB was the ideal partner for this project due to our extensive experience in retrofitting spring elements to buildings. Our long- standing expertise allowed us to effectively address the unique challenges presented by the project. Additionally, GERB offers a wide product range that is suitable for the widely varying loads encountered in such constructions. This versatility ensured that the right solutions were available for every aspect of the project. One of the standout features of GERB‘s service was our ability to deliver the first elements quickly, which helped keep the project on schedule. Furthermore, GERB provided invaluable support during both the design phase and on-site implementation, ensuring that everything ran smoothly.

     

    As a result of this collaboration, the finished hotel has consistently received extremely high ratings in customer satisfaction, highlighting the success of the project and the effectiveness of GERB‘s contributions.

    Solution

    In this recent project, GERB provided comprehensive support for the client by coordinating closely with both the acoustic consultant and the structural engineer. This collaboration allowed GERB to develop bespoke solutions tailored to the specific challenges posed by the existing columns. To ensure optimal performance, we delivered prestressable spring elements of type GS and GP, designed to achieve an isolation frequency of 2.5Hz. Additionally, GERB conducted training sessions for the installation staff to ensure they were well-prepared for the task at hand. Throughout the installation process, regular inspections were carried out to monitor the work and ensure everything was executed to the highest standards.

    Perimeter column
    Internal column
    Internal wall
    Arrangement on piles
    Facade detail

    Technical Facts:

    Structure: steel frame structure, bricked walls, concrete footings
    Vibration source: underground train tunnels

    Elements:

    GS- and GP-type elements
    Base isolation frequency: 2.5 Hz
    Design load: 15,200 kN

    Result

    GERB was the ideal partner for this project due to our extensive experience in retrofitting spring elements to buildings. Our long- standing expertise allowed us to effectively address the unique challenges presented by the project. Additionally, GERB offers a wide product range that is suitable for the widely varying loads encountered in such constructions. This versatility ensured that the right solutions were available for every aspect of the project. One of the standout features of GERB‘s service was our ability to deliver the first elements quickly, which helped keep the project on schedule. Furthermore, GERB provided invaluable support during both the design phase and on-site implementation, ensuring that everything ran smoothly.

    As a result of this collaboration, the finished hotel has consistently received extremely high ratings in customer satisfaction, highlighting the success of the project and the effectiveness of GERB‘s contributions.

    Share this post

    Share this post

    Further Resources

    You need further information on this topic?
    Please do not hesitate to contact us with your individual question.
    One of our project engineers will get back to you shortly.


      Further Resources

      You need further information on this topic?
      Please do not hesitate to contact us with your individual question.
      One of our project engineers will get back to you shortly.


        Scroll to Top
        Scroll to Top